News

15.04.2021
AO Firma TVEMA presented mobile NDT equipment — SPRUT-2, SOM — and track measurement systems — PT-12M, PT-12-01, SHEP— at the conference...
05.04.2021
One of the latest TVEMA developments- composite picket sleepers (CPS) with built-in electronic transcoding devices. The sleepers themselves...
09.03.2021
For almost two years now on the MCD-lines (a system of city train services on existing commuter rail lines in Moscow and Moscow Oblast,...
25.02.2021
Despite of an ongoing pandemic and unpredictable Moscow frosts, this year 2021 started off well and the work is in full swing! In February...
11.01.2021
December 2020 the dispatch of the new series of portable accelerometers “AKSIOMA” designed and produced by AO “Firma TVEMA” upon the...
28.12.2020
In 2019 AO “Firma TVEMA” tied up a contract with OOO “Gazpromtrans” for the supply of cars intended for living and transportation of shift...
18.12.2020
Dear friends! One of pleasures of the Christmas season is the opportunity to extend cordial greetings to those whose friendship we value so...
08.12.2020
November, 26th to 27th, 2020 AO “Firma TVEMA” took part in the international XX Russia-wide academic and research conference named “Train...
18.11.2020
10th to 12th of November, 2020 Asia Pacific’s first virtual event for the railway industry was held. It was the first time, when AO “Firma...
16.11.2020
Upon the request of Israel Railways Ltd. experts of AO “Firma TVEMA” designed high-comfortable diagnostic laboratory module housed by a sea...
13.11.2020
September 2020 the acceptance tests of two vehicular inspection cars “Sprinter- Integral”, that were designed and produced by AO “Firma...
12.11.2020
Late September, 2020 the first acceptance tests of the track recording vehicle for technical monitoring of railway infrastructure model...